lynati: (Default)
[personal profile] lynati
finished final sculpture project and turned it in.
finished final writing project and turned it in.
still have cancer report to work on (Monday).

just finished painting my walls. will touch them up, install shelving, and cut the tile-setters tomorrow during class tiem since I fully expect them to expect us to be there for it, or for most of it.

See about getting "Eclipse" [04] into another salt fire (Friday, ie tomorrow); cast "Gaheris"[05] (bronze piece) with Wickerson (Saturday 9am).

the first two fingers on my right hand are moderately swollen, and sorta numb. it's better than hurting. the other two fingers, general hand, and wrist are all mildly swollen but not stiff, and not really painful. I need a nap if I'm going to pull tonight off; I will take one right after I shower right after I post this.

10pm tonight- de-mold Madison [06] and Kyla [07] after constructing plaster mother-molds for the pair; clean up Maddie and set aside (surface and add her hair tomorrow). fix sockets on Kyla and cast with Urethane. add hair.

before ten PM- finish and cast Colin [08] (plster bandage mold only) and then cast with green wax and hydrocal, making sure to wax in the area his eyes will be to adjust for them later. (No hair).

Finish Carla [09], Jeron [10], and the Back Piece [11]; keep truckign away at Stephanie [12].

that's the 12 pieces for the show, with the Anatomy Tile Set, Bachue, and Nemesis being thr first three pieces.

and they need to be ALL finished and installed by 5 pm tomorrow.

wish me luck.
and stamina.

Profile

lynati: (Default)
lynati

January 2023

S M T W T F S
1234567
891011121314
15161718192021
22232425262728
293031    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 25th, 2025 09:41 am
Powered by Dreamwidth Studios