Nov. 15th, 2002

lynati: (Default)
finished the lamassu by the end of the night, as well as carving the relief of the Large window’s nine centers and the outer inch and a half rim, rolled and cut the pieces for the pagoda and attached them, although the detail work needs to be completed on it, and cut the roughs for the Lakshmi crib’s rockers, but again, detail work is needed. Did more work on the celtic knot one’s form, should be ready to be smooth out by tomorrow.

Re-reading Cyrway’s TF fics, starting from the beginning. Also reading shibby new webcomic linked from Siryn’s journal, “Boy meets Boy”.
Also downloaded Spaceballs, and worked an itty-bit on fic. And filk.
Also need sleep.
lynati: (Default)
1) Yggsdrasil- form finished, need to add terra sigilata

2) Pagoda- need to finish headboard

3) Last Supper- decided to change tactics. Am doing a slip-thing with it. More or less.

4)Lakshmi- form finished

5)Lamassu- form finished

6)Celtic knot- finish press-molding the form

~
status on the remaining tiles has not changed.
~

have so far gotten feedback from two non-familiar sources on my posted mist- one from Demona Taina, who loved it, and one from IX9, who did not.

He told me MiSTing was not the proper way to give feedback to someone...amusing, as he has MiSTs of other people's work posted in the same archive.

doubly so, as My MiST of his MiST of a piece by Goliath 116 is the next one I want to post...I would like to acquire 116's permission to do so first.

working on the Galileo filk...it's moving pretty smoothly.

Profile

lynati: (Default)
lynati

January 2023

S M T W T F S
1234567
891011121314
15161718192021
22232425262728
293031    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 27th, 2025 12:17 pm
Powered by Dreamwidth Studios